Search recommendations based on selected criteria.
RESET
NAICS: 325 - Chemical Manufacturing

4,177

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
LS1905 # 05 Y:2019 USE MORE EFFICIENT LIGHT SOURCE $12,646 $5,202
LS1905 # 04 Y:2019 INSULATE STEAM / HOT WATER LINES $1,865 $640
LS1905 # 03 Y:2019 USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM $24,304 $6,000
LS1905 # 01 Y:2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,092 $50
LS1905 # 02 Y:2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,408 $270
TT0217 # 04 Y:2019 INSULATE BARE EQUIPMENT $3,136 $1,541
TT0217 # 03 Y:2019 RECOVER AND REUSE COOLING WATER $17,311 $400
TT0217 # 01 Y:2019 USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS $35,999 $37,500
TT0217 # 02 Y:2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $29,903 $25,280
IP0113 # 13 Y:2019 USE FLUE GAS HEAT TO PREHEAT BOILER FEEDWATER $4,555 $21,000
IP0113 # 12 Y:2019 RECOVER HEAT FROM AIR COMPRESSOR $892 $2,129
IP0113 # 10 Y:2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $775 $765
IP0113 # 11 Y:2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $476 $1,343
IP0113 # 06 Y:2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,196 $72
IP0113 # 07 Y:2019 USE PHOTOCELL CONTROLS $151 $71
Back to Top