Search recommendations based on selected criteria.
RESET
NAICS: 325 - Chemical Manufacturing

4,216

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
MZ0268 # 07 Y:2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $376,172 $113,000
MZ0268 # 06 Y:2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,884 $10,920
MZ0268 # 04 Y:2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,263 $720
MZ0268 # 05 Y:2019 USE POWER FACTOR CONTROLLERS $1,207 $3,830
MZ0268 # 01 Y:2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $743 $0
MZ0268 # 02 Y:2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $111,884 $145,176
MZ0268 # 03 Y:2019 INSTALL OCCUPANCY SENSORS $25,560 $24,500
NL0031 # 05 Y:2019 REPAIR AND ELIMINATE STEAM LEAKS $5,225 $1,600
NL0031 # 04 Y:2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,390 $24,394
NL0031 # 02 Y:2019 INSTALL TURBULATORS $66,132 $93,000
NL0031 # 03 Y:2019 USE MULTIPLE SPEED MOTORS OR AFD FOR VARIABLE PUMP, BLOWER AND COMPRESSOR LOADS $13,344 $46,600
NL0031 # 01 Y:2019 USE OPTIMUM TEMPERATURE $1,023,132 $386,000
WV0574 # 01 Y:2019 REVISE RAW MATERIAL SPECS $26,910 $52,500
WV0574 # 02 Y:2019 INSTALL OCCUPANCY SENSORS $14,108 $10,162
WV0574 # 03 Y:2019 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $9,375 $3,276
Back to Top