IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ORC003 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $683 $3,000 Not Implemented
ORC003 # 03 Y:2022 03 2022 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,529 $72,976 Not Implemented
ORC003 # 04 Y:2022 04 2022 INSTALL TIMERS AND/OR THERMOSTATS $759 $2,250 Not Implemented
ORC003 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $61 $300 Not Implemented
WV0630 # 01 Y:2022 01 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,322 $44,160 Not Implemented
WV0630 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $2,677 $7,291 Implemented
WV0630 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,523 $279 Implemented
WV0630 # 04 Y:2022 04 2022 MINIMIZE WATER USAGE $706 $2,559 Implemented
WV0630 # 05 Y:2022 05 2022 UPGRADE CONTROLS ON COMPRESSORS $405 $1,431 Implemented
WV0630 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $371 $911 Implemented
WV0630 # 07 Y:2022 07 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $305 $510 Implemented
MS0404 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $176,387 $1,148,430 Not Implemented
MS0404 # 02 Y:2022 02 2022 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $9,805 $22,420 Not Implemented
MS0404 # 03 Y:2022 03 2022 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $853 $525 Not Implemented
MS0404 # 04 Y:2022 04 2022 OPTIMIZE PLANT POWER FACTOR $14,973 $3,790 Not Implemented
SF0589 # 01 Y:2022 01 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,854 $0 Implemented
SF0589 # 02 Y:2022 02 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $53,458 $172,352 Not Implemented
SF0589 # 03 Y:2022 03 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,922 $73,113 Not Implemented
SF0589 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,794 $15,591 Implemented
SF0589 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,635 $18,061 Implemented
SF0589 # 06 Y:2022 06 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $95,881 $341,026 Not Implemented
SF0589 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,416 $292,043 Implemented
AM0855 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,345 $5,000 Implemented
AM0855 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $7,487 $13,455 Not Implemented
AM0855 # 03 Y:2022 03 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,775 $2,575 Not Implemented