IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,679

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0070 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,590 $23,500 Implemented
NL0070 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $32,832 $16,500 Implemented
NL0070 # 03 Y:2022 03 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,148 $35 Implemented
NL0070 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $675 $3,315 Implemented
NL0070 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $490 $854 Implemented
IC0264 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,944 $4,150 Implemented
IC0264 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,361 $10,377 Implemented
IC0264 # 06 Y:2022 06 2022 REDUCE VENTILATION AIR $1,650 $6,000 Implemented
NL0064 # 04 Y:2022 04 2022 USE HIGH PRESSURE WASH SYSTEMS $768 $240 Implemented
NL0064 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,248 $2,875 Implemented
NL0064 # 02 Y:2022 02 2022 INSULATE BARE EQUIPMENT $1,251 $1,729 Implemented
NL0064 # 06 Y:2022 06 2022 INSULATE BARE EQUIPMENT $204 $130 Implemented
NL0064 # 01 Y:2022 01 2022 USE DECANTING, FLOTATION TO REMOVE CONTAMINANTS $79,442 $292,000 Implemented
NL0064 # 05 Y:2022 05 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $331 $90 Implemented
MZ0294 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,295 $2,760 Implemented
MZ0294 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $50 Implemented
MZ0277 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $1,650 $2,700 Implemented
MZ0277 # 09 Y:2019 09 2019 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $409 $1,200 Implemented
MZ0277 # 06 Y:2019 06 2019 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $55,889 $160 Implemented
MZ0277 # 07 Y:2019 07 2019 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $70,665 $233,814 Implemented
MZ0277 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,816 $3,021 Implemented
MZ0277 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,416 $4,211 Implemented
NL0030 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $119 $421 Implemented
NL0030 # 02 Y:2019 02 2019 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,716 $22,557 Implemented
NL0017 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,615 $60,000 Implemented