Search recommendations based on selected criteria.
RESET
NAICS: 331 - Primary Metal Manufacturing

3,910

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
MA0799 # 06 Y:2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,202 $5,200
MA0799 # 04 Y:2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $5,709 $2,500
MA0799 # 05 Y:2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,784 $4,000
MA0799 # 02 Y:2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR $17,826 $47,870
MA0799 # 03 Y:2019 USE MORE EFFICIENT LIGHT SOURCE $11,442 $14,461
MA0799 # 01 Y:2019 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,506 $138,640
OR0716 # 07 Y:2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT COMBUSTION AIR $5,641 $23,504
OR0716 # 06 Y:2019 OPTIMIZE PLANT POWER FACTOR $9,287 $19,796
OR0716 # 05 Y:2019 ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING $11,971 $2,820
OR0716 # 04 Y:2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,289 $0
OR0716 # 03 Y:2019 USE ADJUSTABLE FREQUENCY DRIVE TO REPLACE THROTTLING SYSTEM $22,967 $12,432
OR0716 # 01 Y:2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $170,737 $8,015
OR0716 # 02 Y:2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $96,953 $165,004
NL0029 # 01 Y:2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,632 $18,300
NL0029 # 02 Y:2019 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) $11,970 $4,500
Back to Top