IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,281

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0545 # 01 Y:2023 01 2023 INSTALL TIMERS AND/OR THERMOSTATS $2,922 $570 Implemented
LE0545 # 02 Y:2023 02 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $17,466 $15,150 Implemented
LE0545 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,520 $2,000 Implemented
DL0220 # 12 Y:2023 12 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,150 $8,994 Implemented
DL0220 # 02 Y:2023 02 2023 USE OPTIMUM TEMPERATURE $6,980 $0 Implemented
DL0220 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $84,324 $0 Implemented
LE0529 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,841 $6,763 Implemented
LE0529 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $118,441 $791,800 Implemented
LE0529 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $20,316 $89,649 Implemented
LE0528 # 05 Y:2022 05 2022 UPGRADE OBSOLETE EQUIPMENT $150,000 $150,000 Implemented
LE0528 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,512 $150 Implemented
LE0528 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $150,000 $90,000 Implemented
LE0528 # 07 Y:2022 07 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,451 $15,000 Implemented
LE0528 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,953 $1,000 Implemented
LE0527 # 05 Y:2022 05 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $32,527 $500,000 Implemented
LE0527 # 07 Y:2022 07 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $16,154 $160,000 Implemented
LE0527 # 01 Y:2022 01 2022 PAY BILLS ON TIME TO AVOID LATE FEES $1,805 $0 Implemented
LE0527 # 03 Y:2022 03 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,621 $1,330 Implemented
LE0527 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,500 $3,435 Implemented
LE0526 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,615 $3,540 Implemented
LE0526 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,717 $1,900 Implemented
LE0526 # 01 Y:2022 01 2022 PAY UTILITY BILLS ON TIME $671 $0 Implemented
LE0526 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,461 $2,205 Implemented
LE0526 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,661 $48,235 Implemented
LE0526 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,267 $1,927 Implemented