IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,413

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0648 # 08 Y:2023 08 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,085 $1,500 Implemented
WV0648 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $997 $3,526 Implemented
WV0648 # 10 Y:2023 10 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $798 $127 Not Implemented
WV0648 # 11 Y:2023 11 2023 DEVELOP A REPAIR/REPLACE POLICY $611 $1,094 Not Implemented
WV0648 # 12 Y:2023 12 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $123 $219 Implemented
IC0283 # 01 Y:2023 01 2023 INSULATE BARE EQUIPMENT $112 $886 Implemented
IC0283 # 02 Y:2023 02 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $192 $13 Implemented
IC0283 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,791 $4,650 Not Implemented
IC0283 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $840 Implemented
LE0551 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $69,768 $5,000 Implemented
LE0551 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $203 $300 Not Implemented
LE0551 # 03 Y:2023 03 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $111,339 $525,000 Implemented
MU0029 # 01 Y:2023 01 2023 INSTALL / REPAIR INSULATION ON STEAM LINES $295 $324 Not Implemented
MU0029 # 02 Y:2023 02 2023 AVOID FROST FORMATION ON EVAPORATORS $701 $1,968 Not Implemented
MU0029 # 03 Y:2023 03 2023 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS $1,793 $7,905 Not Implemented
MU0029 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,500 $79 Not Implemented
MU0029 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $178 $0 Not Implemented
MU0038 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $166 $0 Not Implemented
MU0038 # 02 Y:2023 02 2023 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $37 $0 Not Implemented
MU0038 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $1,866 $0 Not Implemented
MU0038 # 04 Y:2023 04 2023 INSULATE BARE EQUIPMENT $2,785 $5,196 Not Implemented
MU0038 # 05 Y:2023 05 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $514 $1,562 Not Implemented
MU0038 # 06 Y:2023 06 2023 UTILIZE A LESS EXPENSIVE COOLING METHOD $6,596 $22,272 Not Implemented
MU0038 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $1,193 $7,618 Not Implemented
MUCM11 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,205 $7,568 Not Implemented