IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,191

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0970 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $93,953 $385,000 n/a
GT0970 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $268 $456 n/a
GT0970 # 03 Y:2023 03 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,675 $1,850 n/a
GT0970 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $37,757 $200 n/a
GT0970 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,613 $75 n/a
GT0970 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $70,120 $1,934,090 n/a
KS2319 # 04 Y:2023 04 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $307 $119 n/a
KS2319 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,385 $5,960 n/a
KS2319 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $593 $60 n/a
KS2319 # 03 Y:2023 03 2023 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $2,009 $5,440 n/a
KS2319 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,663 $19,796 n/a
KS2319 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $123,311 $1,196,880 n/a
CC0016 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,351 $0 n/a
CC0016 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $11 $0 n/a
CC0016 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,427 $1,000 n/a
CC0016 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $19,844 $20,000 n/a
CC0014 # 02 Y:2023 02 2023 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $7,788 $800 n/a
CC0014 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $4,768 $1,000 n/a
CC0014 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,527 $2,000 n/a
CC0014 # 05 Y:2023 05 2023 INSULATE BARE EQUIPMENT $41,841 $26,106 n/a
CC0014 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,695 $11,000 n/a
CC0014 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,932 $53,322 n/a
CC0014 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,512 $1,000 n/a
CC0013 # 05 Y:2023 05 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,597 $180,600 n/a
CC0013 # 04 Y:2023 04 2023 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $21,990 $40,000 n/a