IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0839 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,751 $13,391 Implemented
MA0839 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $366 $2,775 Implemented
AS0520 # 01 Y:2022 01 2022 RECOVER AND REUSE WASTE MATERIAL $3,163,484 $699,500 Implemented
AS0520 # 02 Y:2022 02 2022 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $296,800 $1,447,700 Implemented
AS0520 # 03 Y:2022 03 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $25,969 $50,414 Not Implemented
AS0520 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,685 $19,485 Implemented
UD1040 # 01 Y:2022 01 2022 COVER OPEN TANKS $3,104 $0 Not Implemented
UD1040 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,896 $453 Not Implemented
UD1040 # 03 Y:2022 03 2022 REDUCE VENTILATION AIR $8,723 $0 Not Implemented
UD1040 # 04 Y:2022 04 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $78,304 $700 Not Implemented
UD1040 # 05 Y:2022 05 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $146,536 $40,000 Not Implemented
UD1040 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $45,386 $62,689 Not Implemented
UD1040 # 07 Y:2022 07 2022 INSTALL OCCUPANCY SENSORS $13,562 $11,900 Not Implemented
UD1040 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,768 $58,100 Not Implemented
UD1040 # 09 Y:2022 09 2022 REDUCE VENTILATION AIR $201,271 $872,653 Not Implemented
UD1040 # 10 Y:2022 10 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,313 $0 Not Implemented
LE0526 # 01 Y:2022 01 2022 PAY UTILITY BILLS ON TIME $671 $0 Implemented
LE0526 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,267 $1,927 Implemented
LE0526 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,461 $2,205 Implemented
LE0526 # 04 Y:2022 04 2022 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,817 $1,200 Not Implemented
LE0526 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,717 $1,900 Implemented
LE0526 # 06 Y:2022 06 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,615 $3,540 Implemented
LE0526 # 07 Y:2022 07 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $728 $1,800 Not Implemented
LE0526 # 08 Y:2022 08 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $18,661 $48,235 Implemented
LE0526 # 09 Y:2022 09 2022 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $37,269 $125,000 Not Implemented