Search recommendations based on selected criteria.
RESET
NAICS: 336 - Transportation Equipment Manufacturing

167

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
MI0297 # 14 Y:2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $335 $944
MI0297 # 12 Y:2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,442 $2,628
MI0297 # 08 Y:2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,133 $1,660
MI0297 # 07 Y:2016 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $21,352 $22,281
MI0297 # 05 Y:2016 RECOVER WASTE HEAT FROM EQUIPMENT $23,144 $7,000
MI0278 # 11 Y:2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $671 $1,880
MI0278 # 10 Y:2015 USE OPTIMUM THICKNESS INSULATION $711 $610
MI0278 # 09 Y:2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,181 $40
MI0278 # 08 Y:2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,391 $8,360
MI0278 # 07 Y:2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,804 $480
MI0278 # 06 Y:2015 INSTALL OCCUPANCY SENSORS $4,706 $2,901
MI0278 # 05 Y:2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,235 $1,660
MI0278 # 04 Y:2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,431 $9,248
MI0278 # 03 Y:2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $45,923 $79,106
MI0266 # 09 Y:2014 USE PHOTOCELL CONTROLS $1,450 $360
Back to Top