Search recommendations based on selected criteria.
RESET
NAICS: 336 - Transportation Equipment Manufacturing

102

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
AM0742 # 01 Y:2018 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $9,300 $0
AM0742 # 02 Y:2018 ELIMINATE OR REDUCE COMPRESSED AIR USED FOR COOLING, AGITATING LIQUIDS, MOVING PRODUCT, OR DRYING $3,650 $600
AM0742 # 04 Y:2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $880 $5
TR0005 # 10 Y:2017 ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS $8,320 $966
TR0005 # 08 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $287 $494
TR0005 # 07 Y:2017 USE MORE EFFICIENT LIGHT SOURCE $223 $399
TR0005 # 06 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,836 $8,821
TR0005 # 05 Y:2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $15,338 $56,000
TR0005 # 04 Y:2017 METER WASTE WATER $11,708 $2,650
TR0005 # 03 Y:2017 CHANGE METHOD OF DEIONIZED WATER PRODUCTION $258,000 $292,000
TR0005 # 01 Y:2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,452 $6,500
TR0005 # 11 Y:2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,882 $25,954
TR0003 # 07 Y:2017 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $10,954 $10,000
TR0003 # 05 Y:2017 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT $24,242 $38,964
TR0003 # 04 Y:2017 APPLY FOR INVESTMENT INCENTIVES $74,012 $15,000
Back to Top