IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,578

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0428 # 06 Y:2023 06 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $2,014 $960 Implemented
MI0428 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,867 $1,660 Implemented
MI0428 # 03 Y:2023 03 2023 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,729 $0 Implemented
MI0428 # 08 Y:2023 08 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,396 $2,834 Implemented
MI0428 # 10 Y:2023 10 2023 INSTALL OCCUPANCY SENSORS $1,117 $816 Implemented
MI0428 # 11 Y:2023 11 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $898 $98 Implemented
MI0428 # 09 Y:2023 09 2023 UPGRADE CONTROLS ON COMPRESSORS $1,230 $40 Implemented
MI0428 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $18,313 $3,360 Implemented
UF0597 # 05 Y:2023 05 2023 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,959 $11,134 Implemented
UF0597 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,612 $25,370 Implemented
UF0597 # 07 Y:2023 07 2023 INSTALL OCCUPANCY SENSORS $1,699 $4,994 Implemented
UF0597 # 04 Y:2023 04 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,142 $22,000 Implemented
UF0597 # 06 Y:2023 06 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,382 $13,706 Implemented
UF0597 # 09 Y:2023 09 2023 IMPROVE SPACE COMFORT CONDITIONING $35,500 $4,261 Implemented
UF0597 # 08 Y:2023 08 2023 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $51,744 $18,218 Implemented
UF0597 # 01 Y:2023 01 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $20,876 $14,705 Implemented
UF0597 # 02 Y:2023 02 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,736 $15,722 Implemented
UF0595 # 08 Y:2023 08 2023 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $1,317 $5,838 Implemented
UF0595 # 03 Y:2023 03 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,931 $25,400 Implemented
UF0595 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,458 $356 Implemented
UF0595 # 07 Y:2023 07 2023 INSTALL SUB-METERING EQUIPMENT $1,589 $4,340 Implemented
UF0595 # 02 Y:2023 02 2023 USE DEMAND CONTROLLER OR LOAD SHEDDER $39,683 $20,785 Implemented
UF0595 # 10 Y:2023 10 2023 IMPROVE SPACE COMFORT CONDITIONING $20,697 $4,480 Implemented
UF0595 # 06 Y:2023 06 2023 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $2,957 $3,276 Implemented
UF0595 # 09 Y:2023 09 2023 INSTALL OCCUPANCY SENSORS $1,092 $2,160 Implemented