Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0384 # 07 Y:2006 | 07 | 2006 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $2,857 | $575 | Not Implemented |
UF0384 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $25,292 | $72,945 | Not Implemented |
UF0384 # 09 Y:2006 | 09 | 2006 | INCREASE EFFICIENCY OF TRUCKS | $2,312 | $0 | Not Implemented |
MI0132 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $49 | $2,342 | Implemented |
MI0132 # 02 Y:2006 | 02 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $889 | $0 | Implemented |
MI0132 # 03 Y:2006 | 03 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $222 | $1,732 | Implemented |
MI0132 # 04 Y:2006 | 04 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8 | $23,253 | Not Implemented |
MI0132 # 05 Y:2006 | 05 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $697 | $20,253 | Not Implemented |
MI0131 # 01 Y:2006 | 01 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $42,001 | $40,224 | Implemented |
MI0131 # 02 Y:2006 | 02 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $41,642 | $6,538 | Implemented |
MI0131 # 03 Y:2006 | 03 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $16,391 | $29,320 | Implemented |
MI0131 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,321 | $1,074 | Implemented |
MI0131 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,701 | $180 | Implemented |
MI0131 # 06 Y:2006 | 06 | 2006 | INSULATE BARE EQUIPMENT | $5,552 | $216 | Implemented |
MI0131 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,332 | $0 | Implemented |
MI0131 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,254 | $30 | Implemented |
UF0383 # 01 Y:2006 | 01 | 2006 | USE PHOTOCELL CONTROLS | $952 | $954 | Not Implemented |
UF0383 # 02 Y:2006 | 02 | 2006 | INSTALL OCCUPANCY SENSORS | $3,247 | $456 | Not Implemented |
UF0383 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,179 | $126 | Implemented |
UF0383 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,149 | $1,296 | Implemented |
UF0383 # 05 Y:2006 | 05 | 2006 | ISOLATE HOT OR COLD EQUIPMENT | $602 | $85 | Not Implemented |
UF0383 # 06 Y:2006 | 06 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,891 | $2,960 | Not Implemented |
UF0383 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,618 | $0 | Not Implemented |
UF0383 # 08 Y:2006 | 08 | 2006 | PAY UTILITY BILLS ON TIME | $235 | $0 | Implemented |
UF0382 # 01 Y:2006 | 01 | 2006 | USE PHOTOCELL CONTROLS | $4,721 | $2,760 | Not Implemented |