IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0382 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,902 $900 Not Implemented
UF0382 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $1,971 $1,275 Not Implemented
UF0382 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,024 $7,567 Not Implemented
UF0382 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $515 $2,079 Not Implemented
UF0382 # 06 Y:2006 06 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $21,646 $1,350 Not Implemented
UF0382 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $1,876 $571 Not Implemented
UF0382 # 08 Y:2006 08 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,305 $1,000 Not Implemented
UF0382 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $393 $0 Not Implemented
UF0382 # 10 Y:2006 10 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,973 $0 Not Implemented
UF0382 # 11 Y:2006 11 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,029 $3,200 Not Implemented
UF0382 # 12 Y:2006 12 2006 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $6,821 $0 Not Implemented
UF0382 # 13 Y:2006 13 2006 RECYCLE FLUORESCENT LAMPS $342 $3,237 Not Implemented
UF0382 # 14 Y:2006 14 2006 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,240 $8,000 Not Implemented
UF0380 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,443 $1,104 Not Implemented
UF0380 # 02 Y:2006 02 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $886 $0 Not Implemented
UF0380 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $961 $353 Not Implemented
UF0380 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $388,094 $48,067 Implemented
UF0380 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $1,085 $4,305 Not Implemented
UF0380 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $44,780 $2,688 Implemented
UF0380 # 07 Y:2006 07 2006 ELIMINATE A BY-PRODUCT $703 $160 Implemented
UF0378 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $7,955 $7,050 Not Implemented
UF0378 # 02 Y:2006 02 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $10,965 $5,044 Implemented
UF0378 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,337 $598 Implemented
UF0378 # 04 Y:2006 04 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $10,260 $2,640 Implemented
UF0378 # 05 Y:2006 05 2006 ADD AREA LIGHTING SWITCHES $4,427 $15,444 Implemented