IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0125 # 05 Y:2006 05 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $9,589 $850 Implemented
MI0125 # 06 Y:2006 06 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,852 $4,800 Not Implemented
MI0125 # 07 Y:2006 07 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,013 $395 Implemented
UF0376 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,968 $27,399 Not Implemented
UF0376 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,222 $2,053 Not Implemented
UF0376 # 03 Y:2006 03 2006 ADD AREA LIGHTING SWITCHES $878 $2,646 Not Implemented
UF0376 # 04 Y:2006 04 2006 INSTALL BACK-UP EQUIPMENT $1,632,456 $5,315 Not Implemented
UF0376 # 05 Y:2006 05 2006 AIR CONDITION ONLY SPACE NECESSARY $1,014 $3,200 Not Implemented
UF0376 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $150 $1,480 Not Implemented
UF0376 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $369 $0 Not Implemented
UF0376 # 08 Y:2006 08 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $148 $0 Not Implemented
UF0375 # 01 Y:2006 01 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,929 $15,889 Not Implemented
UF0375 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,307 $33,550 Not Implemented
UF0375 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $85,158 $3,540 Implemented
UF0375 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,627 $180 Implemented
UF0375 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $129,429 $17,000 Implemented
UF0375 # 06 Y:2006 06 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,443 $49,050 Not Implemented
UF0375 # 07 Y:2006 07 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $12,590 $0 Implemented
UF0375 # 08 Y:2006 08 2006 DISCONNECT BALLASTS $2,018 $0 Implemented
UF0375 # 09 Y:2006 09 2006 INSTALL BACK-UP EQUIPMENT $1,160,914 $79,825 Not Implemented
MI0124 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,063 $40,180 n/a
MI0124 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,719 $2,400 n/a
MI0124 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,540 $28 n/a
MI0124 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $950 $1,018 n/a
MI0124 # 05 Y:2006 05 2006 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,268 $31,176 n/a