IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0120 # 01 Y:2006 01 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $178,061 $75,000 Not Implemented
MI0120 # 02 Y:2006 02 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $145,490 $5,540 Not Implemented
MI0120 # 03 Y:2006 03 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,318 $0 Not Implemented
MI0120 # 04 Y:2006 04 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,956 $5,024 Not Implemented
MI0120 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,982 $56 Not Implemented
UF0374 # 01 Y:2006 01 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $22,510 $54,165 Not Implemented
UF0374 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $43,329 $868 Implemented
UF0374 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,278 $12,817 Implemented
UF0374 # 04 Y:2006 04 2006 IMPROVE SPACE COMFORT CONDITIONING $6,479 $13,400 Not Implemented
UF0374 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,506 $4,360 Implemented
UF0374 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,005 $1,355 Implemented
UF0374 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,895 $1,653 Implemented
UF0374 # 08 Y:2006 08 2006 INSTALL SKYLIGHTS $1,181 $9,627 Not Implemented
UF0374 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,339 $24,500 Not Implemented
UF0374 # 10 Y:2006 10 2006 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $3,016 $0 Implemented
UF0373 # 01 Y:2006 01 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,471 $1,124 Implemented
UF0373 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $1,366 $0 Implemented
UF0373 # 03 Y:2006 03 2006 INSTALL OCCUPANCY SENSORS $13,109 $1,327 Implemented
UF0373 # 04 Y:2006 04 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,178 $1,272 Implemented
UF0373 # 05 Y:2006 05 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $15,306 $1,300 Implemented
UF0373 # 06 Y:2006 06 2006 AIR CONDITION ONLY SPACE NECESSARY $13,549 $36,650 Not Implemented
UF0373 # 07 Y:2006 07 2006 RECYCLE FLUORESCENT LAMPS $312 $3,496 Not Implemented
UF0373 # 08 Y:2006 08 2006 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,448 $954 Implemented
UF0373 # 09 Y:2006 09 2006 IMPROVE SPACE COMFORT CONDITIONING $26,438 $1,500 Implemented
UF0372 # 01 Y:2005 01 2005 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $22,802 $2,143 Implemented