IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84,208

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0279 # 05 Y:2003 05 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,983 $165 Not Implemented
WV0279 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,685 $510 Implemented
WV0279 # 07 Y:2003 07 2003 INSTALL OCCUPANCY SENSORS $4,123 $2,300 Implemented
WV0279 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,474 $1,400 Not Implemented
WV0279 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,083 $70 Not Implemented
WV0279 # 10 Y:2003 10 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $744 $135 Not Implemented
UM0243 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $142,452 $31,500 Implemented
UM0243 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $20,715 $4,565 Not Implemented
UM0243 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,928 $520 Implemented
UM0243 # 04 Y:2003 04 2003 AIR CONDITION ONLY SPACE NECESSARY $13,955 $6,000 Implemented
UM0243 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,857 $150 Implemented
UM0243 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,082 $100 Not Implemented
LL0175 # 01 Y:2003 01 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $9,977 $945 Not Implemented
LL0175 # 02 Y:2003 02 2003 USE PHOTOCELL CONTROLS $3,273 $280 Not Implemented
LL0175 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,190 $15 Not Implemented
LL0175 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $746 $56 Not Implemented
LL0175 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $594 $800 Not Implemented
LL0175 # 06 Y:2003 06 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $40,875 $100,279 Not Implemented
LL0175 # 07 Y:2003 07 2003 COMBINE UTILITY METERS $1,625 $0 Not Implemented
NC0265 # 01 Y:2003 01 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,793 $7,000 Implemented
NC0265 # 02 Y:2003 02 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $13,226 $24,506 Implemented
NC0265 # 03 Y:2003 03 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $7,348 $3,525 Implemented
NC0265 # 04 Y:2003 04 2003 RECOVER WASTE HEAT FROM EQUIPMENT $5,206 $1,100 Not Implemented
NC0265 # 05 Y:2003 05 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $7,094 $1,000 Implemented
NC0265 # 06 Y:2003 06 2003 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,361 $0 Implemented