Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122,146
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0098 # 02 Y:1983 | 02 | 1983 | INSTALL STORM WINDOWS AND DOORS | $9,286 | $8,000 | Not Implemented |
UD0098 # 03 Y:1983 | 03 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $992 | $590 | Not Implemented |
UD0098 # 04 Y:1983 | 04 | 1983 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $6,313 | $11,424 | Not Implemented |
UD0098 # 05 Y:1983 | 05 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,383 | $0 | Not Implemented |
UD0099 # 01 Y:1983 | 01 | 1983 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $4,571 | $10,000 | Not Implemented |
UD0099 # 02 Y:1983 | 02 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $9,454 | $4,000 | Not Implemented |
UD0099 # 03 Y:1983 | 03 | 1983 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $633 | $0 | Not Implemented |
TN0177 # 01 Y:1983 | 01 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $7,055 | $1,170 | Not Implemented |
TN0177 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,540 | $400 | Implemented |
TN0177 # 03 Y:1983 | 03 | 1983 | USE MINIMUM STEAM OPERATING PRESSURE | $2,625 | $400 | Implemented |
TN0179 # 01 Y:1983 | 01 | 1983 | OPTIMIZE PLANT POWER FACTOR | $8,400 | $5,000 | Implemented |
TN0179 # 02 Y:1983 | 02 | 1983 | INSULATE BARE EQUIPMENT | $2,291 | $5,700 | Implemented |
TN0179 # 03 Y:1983 | 03 | 1983 | USE SOLAR HEAT TO HEAT WATER | $826 | $24,000 | Implemented |
KU0101 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,002 | $600 | Not Implemented |
KU0101 # 02 Y:1983 | 02 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $199 | $300 | Not Implemented |
KU0101 # 03 Y:1983 | 03 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $230 | $750 | Not Implemented |
KU0101 # 04 Y:1983 | 04 | 1983 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $107 | $0 | Not Implemented |
KU0101 # 05 Y:1983 | 05 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $410 | $0 | Not Implemented |
KU0102 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $612 | $1,228 | Not Implemented |
KU0102 # 02 Y:1983 | 02 | 1983 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $1,389 | $4,000 | Implemented |
KU0102 # 03 Y:1983 | 03 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,241 | $360 | Not Implemented |
KU0102 # 04 Y:1983 | 04 | 1983 | INSTALL AUTOMATIC STACK DAMPER | $824 | $700 | Implemented |
KU0102 # 05 Y:1983 | 05 | 1983 | INSTALL TIMERS AND/OR THERMOSTATS | $808 | $1,200 | Not Implemented |
KU0102 # 06 Y:1983 | 06 | 1983 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $341 | $0 | Not Implemented |
KU0103 # 01 Y:1983 | 01 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $814 | $862 | Not Implemented |