IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0152 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,378 $527 Implemented
MA0152 # 02 Y:1989 02 1989 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $7,925 $40,371 Not Implemented
MA0152 # 03 Y:1989 03 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,765 $2,300 Not Implemented
MA0152 # 04 Y:1989 04 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,320 $18,000 Not Implemented
MA0152 # 05 Y:1989 05 1989 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $208 $0 Implemented
MA0152 # 06 Y:1989 06 1989 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $400 $0 Implemented
MA0153 # 01 Y:1989 01 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $632 $217 Not Implemented
MA0153 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $878 $163 Implemented
MA0153 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,825 $500 Implemented
MA0153 # 04 Y:1989 04 1989 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $19,722 $115,000 Not Implemented
MA0153 # 05 Y:1989 05 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,985 $1,910 Not Implemented
MA0153 # 06 Y:1989 06 1989 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $530 $218 Not Implemented
MA0153 # 07 Y:1989 07 1989 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,615 $3,000 Not Implemented
GT0378 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $270 $722 Implemented
GT0378 # 02 Y:1989 02 1989 INSTALL SET-BACK TIMERS $800 $160 Implemented
GT0378 # 03 Y:1989 03 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $6,940 $9,000 Implemented
GT0378 # 04 Y:1989 04 1989 UTILIZE SENSORS CONTROLLING ROOF AND WALL OPENINGS $65 $40 Implemented
GT0378 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $250 $300 Implemented
GT0378 # 06 Y:1989 06 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,183 $1,725 Implemented
GT0379 # 01 Y:1989 01 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,310 $13,690 Not Implemented
GT0379 # 02 Y:1989 02 1989 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $905 $403 Not Implemented
GT0379 # 03 Y:1989 03 1989 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,912 $4,250 Not Implemented
GT0379 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $386 $0 Not Implemented
GT0379 # 05 Y:1989 05 1989 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,340 $9,000 Not Implemented
GT0379 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $234 $0 Not Implemented