IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,413

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0060 # 02 Y:1989 02 1989 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $18,359 $16,835 Implemented
RU0060 # 03 Y:1989 03 1989 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,856 $6,900 Not Implemented
RU0060 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,256 $0 Implemented
RU0060 # 05 Y:1989 05 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,180 $102 Implemented
RU0060 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,072 $1,500 Implemented
RU0061 # 01 Y:1989 01 1989 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,588 $2,880 Implemented
RU0061 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $785 $203 Not Implemented
RU0061 # 03 Y:1989 03 1989 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $1,320 $0 Not Implemented
WI0059 # 10 Y:1989 10 1989 INSULATE BARE EQUIPMENT $258 $175 Not Implemented
WI0058 # 01 Y:1989 01 1989 INSTALL TIMERS AND/OR THERMOSTATS $20,838 $3,000 Implemented
WI0058 # 02 Y:1989 02 1989 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,185 $20,000 Not Implemented
WI0058 # 03 Y:1989 03 1989 IMPROVE LUBRICATION PRACTICES $7,226 $0 Implemented
WI0058 # 04 Y:1989 04 1989 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,645 $4,200 Not Implemented
WI0058 # 05 Y:1989 05 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,077 $500 Implemented
WI0058 # 06 Y:1989 06 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,523 $0 Implemented
WI0058 # 07 Y:1989 07 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,585 $1,500 Implemented
WI0058 # 08 Y:1989 08 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $1,395 $800 Not Implemented
WI0058 # 09 Y:1989 09 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $668 $0 Implemented
WI0058 # 10 Y:1989 10 1989 INSTALL STORM WINDOWS AND DOORS $865 $1,334 Not Implemented
WI0058 # 11 Y:1989 11 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $639 $0 Not Implemented
WI0059 # 01 Y:1989 01 1989 IMPROVE LUBRICATION PRACTICES $12,658 $0 Not Implemented
WI0059 # 02 Y:1989 02 1989 TURN OFF EQUIPMENT WHEN NOT IN USE $8,983 $800 Implemented
WI0059 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,916 $5,000 Implemented
WI0059 # 04 Y:1989 04 1989 RECOVER WASTE HEAT FROM EQUIPMENT $5,025 $3,000 Not Implemented
WI0059 # 05 Y:1989 05 1989 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,400 $3,750 Implemented