IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,455

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0059 # 07 Y:1989 07 1989 IMPROVE LUBRICATION PRACTICES $227 $0 Not Implemented
AM0059 # 08 Y:1989 08 1989 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $166 $340 Implemented
AM0059 # 09 Y:1989 09 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $110 $0 Implemented
AM0060 # 01 Y:1989 01 1989 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $59,200 $0 Implemented
AM0060 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,080 $24,686 Not Implemented
AM0060 # 03 Y:1989 03 1989 COVER OPEN TANKS $9,300 $0 Implemented
AM0060 # 04 Y:1989 04 1989 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,440 $900 Not Implemented
AM0060 # 05 Y:1989 05 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,320 $0 Not Implemented
AM0060 # 06 Y:1989 06 1989 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,210 $940 Not Implemented
AM0060 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $540 $420 Not Implemented
AM0060 # 08 Y:1989 08 1989 INSULATE BARE EQUIPMENT $1,080 $1,080 Implemented
AM0061 # 01 Y:1989 01 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,000 $270 Implemented
AM0061 # 02 Y:1989 02 1989 OPTIMIZE PLANT POWER FACTOR $18,950 $29,790 Implemented
AM0061 # 03 Y:1989 03 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,660 $19,050 Not Implemented
AM0061 # 04 Y:1989 04 1989 INSULATE BARE EQUIPMENT $2,990 $1,000 Implemented
AM0061 # 05 Y:1989 05 1989 REPAIR AND ELIMINATE STEAM LEAKS $3,029 $840 Implemented
AM0061 # 06 Y:1989 06 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,490 $540 Not Implemented
AM0061 # 07 Y:1989 07 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,275 $500 Implemented
AM0061 # 08 Y:1989 08 1989 IMPROVE LUBRICATION PRACTICES $745 $0 Not Implemented
AM0061 # 09 Y:1989 09 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $83 $80 Not Implemented
AM0062 # 01 Y:1989 01 1989 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $2,350 $3,160 Not Implemented
AM0062 # 02 Y:1989 02 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,090 $7,752 Not Implemented
AM0062 # 03 Y:1989 03 1989 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,440 $2,000 Not Implemented
AM0062 # 04 Y:1989 04 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $828 $500 Implemented
AM0062 # 05 Y:1989 05 1989 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $624 $420 Implemented