IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0340 # 01 Y:1988 01 1988 RECOVER WASTE HEAT FROM EQUIPMENT $1,410 $1,640 Implemented
GT0340 # 02 Y:1988 02 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,580 $1,000 Implemented
GT0340 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $320 $160 Implemented
GT0340 # 04 Y:1988 04 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,790 $12,930 Not Implemented
GT0340 # 05 Y:1988 05 1988 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,300 $1,800 Implemented
GT0340 # 06 Y:1988 06 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $213 $237 Implemented
GT0341 # 01 Y:1988 01 1988 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $360 $550 Implemented
GT0341 # 02 Y:1988 02 1988 REDUCE VENTILATION AIR $2,230 $400 Implemented
GT0341 # 03 Y:1988 03 1988 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,170 $760 Not Implemented
GT0341 # 04 Y:1988 04 1988 KEEP LAMPS AND REFLECTORS CLEAN $1,730 $3,720 Not Implemented
GT0341 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $480 $460 Not Implemented
GT0341 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $111 $112 Not Implemented
GT0341 # 07 Y:1988 07 1988 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,850 $400 Implemented
GT0342 # 01 Y:1988 01 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $60 $0 Implemented
GT0342 # 02 Y:1988 02 1988 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $30 $100 Implemented
GT0342 # 03 Y:1988 03 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,400 $13,460 Not Implemented
GT0342 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $86 $94 Not Implemented
GT0343 # 01 Y:1988 01 1988 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,269 $0 Not Implemented
GT0343 # 02 Y:1988 02 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,063 $6,645 Not Implemented
GT0343 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,010 $1,800 Not Implemented
GT0343 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $178 $76 Not Implemented
GT0343 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14 $25 Not Implemented
CO0126 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,082 $2,000 Implemented
CO0126 # 02 Y:1988 02 1988 DIRECT WARMEST AIR TO COMBUSTION INTAKE $633 $550 Not Implemented
CO0126 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,087 $1,000 Implemented