Search recommendations based on selected criteria.
RESET

141,687

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
UD0047 # 02 Y:1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $122
UD0048 # 04 Y:1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,992 $1,000
UD0048 # 03 Y:1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $815 $600
UD0048 # 01 Y:1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,576 $1,603
UD0048 # 02 Y:1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $4,904 $2,500
UD0049 # 05 Y:1982 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $7,008 $7,500
UD0049 # 04 Y:1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $14,665 $163,485
UD0049 # 03 Y:1982 REDUCE GLAZED AREAS IN BUILDINGS $28,537 $40,346
UD0049 # 02 Y:1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $773 $0
UD0049 # 01 Y:1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,155 $320
UD0050 # 05 Y:1982 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $233 $0
UD0050 # 04 Y:1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,051 $5,156
UD0050 # 03 Y:1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,054 $2,800
UD0050 # 02 Y:1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,817 $400
UD0050 # 01 Y:1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,891 $396
Back to Top