Search recommendations based on selected criteria.
RESET

140,922

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
KU0028 # 02 Y:1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,428 $3,992
KU0029 # 07 Y:1981 INSTALL WEATHER STRIPPING ON WINDOWS AND DOORS $3,505 $6,302
KU0029 # 06 Y:1981 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,568 $2,688
KU0029 # 05 Y:1981 OPTIMIZE PLANT POWER FACTOR $310 $500
KU0029 # 04 Y:1981 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,911 $0
KU0029 # 03 Y:1981 REVISE SMOKE CLEANUP FROM OPERATIONS $2,846 $3,200
KU0029 # 02 Y:1981 INSTALL TIMERS AND/OR THERMOSTATS $310 $0
KU0029 # 01 Y:1981 COVER OPEN TANKS $2,125 $55
UD0018 # 05 Y:1981 INSULATE BARE EQUIPMENT $10,990 $10,000
UD0018 # 04 Y:1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $94 $60
UD0018 # 03 Y:1981 USE OPTIMUM THICKNESS INSULATION $445 $0
UD0018 # 01 Y:1981 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $610 $45
UD0018 # 02 Y:1981 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $9,469 $32,000
KU0027 # 01 Y:1981 INSTALL AUTOMATIC STACK DAMPER $1,605 $1,800
KU0022 # 06 Y:1981 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $620 $1,620
Back to Top