IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

449

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0646 # 12 Y:2023 12 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,904 $1,500 Implemented
WV0646 # 05 Y:2023 05 2023 UPGRADE CONTROLS ON COMPRESSORS $8,960 $12,682 Implemented
WV0646 # 15 Y:2023 15 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $419 $909 Implemented
WV0646 # 13 Y:2023 13 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $669 $1,895 Implemented
WV0646 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,436 $1,807 Implemented
WV0646 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $3,094 $1,481 Implemented
WV0646 # 08 Y:2023 08 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,490 $301 Implemented
WV0646 # 06 Y:2023 06 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $7,758 $31,568 Implemented
WV0646 # 14 Y:2023 14 2023 INSTALL OCCUPANCY SENSORS $644 $1,312 Implemented
WV0646 # 16 Y:2023 16 2023 INSULATE BARE EQUIPMENT $357 $407 Implemented
WV0642 # 09 Y:2023 09 2023 DEVELOP A REPAIR/REPLACE POLICY $2,563 $5,683 Implemented
WV0642 # 13 Y:2023 13 2023 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $807 $970 Implemented
WV0642 # 10 Y:2023 10 2023 UPGRADE CONTROLS ON COMPRESSORS $2,313 $3,080 Implemented
WV0642 # 12 Y:2023 12 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,386 $200 Implemented
WV0642 # 06 Y:2023 06 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $5,167 $1,500 Implemented
WV0642 # 14 Y:2023 14 2023 INSULATE BARE EQUIPMENT $239 $503 Implemented
WV0642 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,435 $1,980 Implemented
WV0642 # 11 Y:2023 11 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,222 $1,250 Implemented
WV0642 # 08 Y:2023 08 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,587 $3,721 Implemented
DL0217 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,120 $0 Implemented
DL0217 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,180 $0 Implemented
DL0217 # 06 Y:2023 06 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $30,600 $0 Implemented
DL0217 # 08 Y:2023 08 2023 REDUCE VENTILATION AIR $1,715 $750 Implemented
DL0217 # 11 Y:2023 11 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,318 $4,100 Implemented
DL0217 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $2,650 $0 Implemented