IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

422

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0216 # 06 Y:2023 06 2023 RECOVER WASTE HEAT FROM EQUIPMENT $12,154 $50,000 Implemented
DL0216 # 07 Y:2023 07 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,672 $0 Implemented
DL0216 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $93,960 $250,000 Implemented
DL0216 # 05 Y:2023 05 2023 BURN A LESS EXPENSIVE GRADE OF FUEL $48,610 $0 Implemented
DL0216 # 02 Y:2023 02 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $124,500 $181,000 Implemented
DL0208 # 07 Y:2022 07 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $23,194 $11,933 Implemented
DL0208 # 12 Y:2022 12 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $436 $2,500 Implemented
DL0208 # 10 Y:2022 10 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $11,982 $55,000 Implemented
DL0208 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $583 $0 Implemented
DL0208 # 08 Y:2022 08 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,331 $2,230 Implemented
DL0208 # 05 Y:2022 05 2022 INSTALL TIMERS AND/OR THERMOSTATS $3,567 $71 Implemented
DL0208 # 09 Y:2022 09 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,770 $33,570 Implemented
DL0207 # 10 Y:2022 10 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $6,208 Implemented
DL0207 # 07 Y:2022 07 2022 RECOVER WASTE HEAT FROM EQUIPMENT $801 $449 Implemented
DL0207 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $557 $1,000 Implemented
DL0207 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,522 $1,016 Implemented
DL0207 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,027 $0 Implemented
DL0207 # 13 Y:2022 13 2022 ELIMINATE LEAKS IN COMBUSTIBLE GAS LINES $1,993 $2,500 Implemented
DL0206 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,447 $8,852 Implemented
DL0206 # 01 Y:2022 01 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $917 $0 Implemented
DL0206 # 04 Y:2022 04 2022 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,028 $27,352 Implemented
DL0206 # 03 Y:2022 03 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,292 $0 Implemented
DL0201 # 13 Y:2021 13 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $611 $870 Implemented
DL0201 # 04 Y:2021 04 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,065 $0 Implemented
DL0201 # 15 Y:2021 15 2021 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $14,535 $2,912 Implemented