Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
158,308
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0579 # 04 Y:2022 | 04 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,945 | $25,600 | Not Implemented |
UF0579 # 05 Y:2022 | 05 | 2022 | INSTALL OCCUPANCY SENSORS | $5,294 | $10,558 | Implemented |
UF0579 # 06 Y:2022 | 06 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,095 | $12,753 | Implemented |
UF0579 # 07 Y:2022 | 07 | 2022 | OPTIMIZE PLANT POWER FACTOR | $2,079 | $5,093 | Not Implemented |
UF0579 # 08 Y:2022 | 08 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,003 | $0 | Implemented |
UF0579 # 09 Y:2022 | 09 | 2022 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $47,401 | $10,000 | Not Implemented |
UF0579 # 10 Y:2022 | 10 | 2022 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $4,716 | $0 | Implemented |
UF0579 # 11 Y:2022 | 11 | 2022 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $540,144 | $53,000 | Implemented |
UD1039 # 01 Y:2022 | 01 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $55 | $0 | Not Implemented |
UD1039 # 02 Y:2022 | 02 | 2022 | INSULATE BARE EQUIPMENT | $1,123 | $714 | Not Implemented |
UD1039 # 03 Y:2022 | 03 | 2022 | INSTALL OCCUPANCY SENSORS | $306 | $202 | Not Implemented |
UD1039 # 04 Y:2022 | 04 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,423 | $5,000 | Not Implemented |
UD1039 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $875 | $316 | Not Implemented |
UD1039 # 06 Y:2022 | 06 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,654 | $50 | Not Implemented |
UD1039 # 07 Y:2022 | 07 | 2022 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $1,304 | $2,369 | Not Implemented |
TT0278 # 01 Y:2022 | 01 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,020 | $107,478 | Implemented |
TT0278 # 02 Y:2022 | 02 | 2022 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $14,885 | $400 | Not Implemented |
TT0278 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,152 | $1,500 | Implemented |
TT0278 # 04 Y:2022 | 04 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,912 | $18,000 | Implemented |
TT0278 # 05 Y:2022 | 05 | 2022 | INSTALL TIMERS AND/OR THERMOSTATS | $4,507 | $150 | Not Implemented |
TT0278 # 06 Y:2022 | 06 | 2022 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,143 | $0 | Not Implemented |
TT0278 # 07 Y:2022 | 07 | 2022 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $3,425 | $0 | Implemented |
TT0278 # 08 Y:2022 | 08 | 2022 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $2,362 | $2,736 | Implemented |
SU0513 # 01 Y:2022 | 01 | 2022 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $251 | $0 | Not Implemented |
SU0513 # 02 Y:2022 | 02 | 2022 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,425 | $41 | Not Implemented |