IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2205 # 02 Y:2022 02 2022 OPTIMIZE PLANT POWER FACTOR $83,199 $100,000 Not Implemented
UL2205 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $80,954 $524,616 Not Implemented
UL2205 # 04 Y:2022 04 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $427,303 $4,465,290 Not Implemented
UL2205 # 05 Y:2022 05 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $9,986 $0 Implemented
OK1072 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,650 $0 Implemented
OK1072 # 02 Y:2022 02 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,749 $0 Not Implemented
OK1072 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $439 $2,000 Not Implemented
OK1072 # 04 Y:2022 04 2022 INSTALL SUB-METERING EQUIPMENT $173,223 $1,272 Not Implemented
OK1072 # 05 Y:2022 05 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $265,528 $1,357,737 Not Implemented
TT0273 # 01 Y:2022 01 2022 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $197,305 $1,241,200 Not Implemented
TT0273 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $65,016 $5,000 Implemented
TT0273 # 03 Y:2022 03 2022 INSULATE BARE EQUIPMENT $51,693 $8,551 Not Implemented
TT0273 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,155 $2,860 Implemented
TT0273 # 05 Y:2022 05 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,192 $2,000 Not Implemented
TT0273 # 06 Y:2022 06 2022 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,707 $400 Not Implemented
TT0273 # 07 Y:2022 07 2022 INSULATE BARE EQUIPMENT $1,084 $428 Not Implemented
TT0273 # 08 Y:2022 08 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,072 $1,926 Implemented
TT0273 # 09 Y:2022 09 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $780 $2,250 Not Implemented
TT0273 # 10 Y:2022 10 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $633 $1,500 Not Implemented
TT0273 # 11 Y:2022 11 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $356 $700 Implemented
LS1422 # 01 Y:2022 01 2022 INSTALL OCCUPANCY SENSORS $590 $200 Implemented
LS1422 # 02 Y:2022 02 2022 REDUCE HEAT GAIN BY WINDOW TINTING $7,066 $2,925 Not Implemented
LS1422 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,581 $7,172 Implemented
LS1422 # 04 Y:2022 04 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,400 $11,760 Not Implemented
LS1422 # 05 Y:2022 05 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $1,392 $5,200 Not Implemented