IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,308

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1322 # 01 Y:2022 01 2022 INSTALL TIMERS AND/OR THERMOSTATS $2,827 $100 Implemented
LS1322 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $747 $375 Implemented
LS1322 # 03 Y:2022 03 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $5,493 $3,200 Not Implemented
LS1322 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,044 $31,514 Implemented
LE0525 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $993 $150 Implemented
LE0525 # 02 Y:2022 02 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,698 $5,000 Not Implemented
LE0525 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $108,808 $250,000 Not Implemented
LE0525 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $763 $2,001 Implemented
LE0525 # 05 Y:2022 05 2022 BURN WOOD BY-PRODUCTS FOR HEAT $41,476 $130,000 Not Implemented
LE0525 # 06 Y:2022 06 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,480 $20,000 Not Implemented
UA0257 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $89,160 $80,028 Implemented
UA0257 # 02 Y:2022 02 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,505 $1,000 Implemented
UA0257 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,741 $8,591 Implemented
UA0257 # 04 Y:2022 04 2022 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,731 $150 Implemented
UA0257 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,573 $5,533 Not Implemented
CO0743 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $9,876 $84,276 n/a
CO0743 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $9,304 $42,082 n/a
CO0743 # 03 Y:2022 03 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $2,506 $9,960 n/a
CO0743 # 04 Y:2022 04 2022 RECOVER AND REUSE WASTE MATERIAL $1,718 $4,820 n/a
CO0743 # 05 Y:2022 05 2022 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $7,800 $26,000 n/a
CW0123 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $518 $105 n/a
CW0123 # 02 Y:2022 02 2022 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $1,422 $4,000 n/a
CW0123 # 03 Y:2022 03 2022 REPLACE HEXAVALENT CHROMIUM SOLUTIONS WITH TRIVALENT SOLUTIONS $30,091 $55,770 n/a
CW0123 # 04 Y:2022 04 2022 IMPROVE LUBRICATION PRACTICES $27,999 $8,008 n/a
CW0123 # 05 Y:2022 05 2022 USE OPTIMUM TEMPERATURE $4,521 $3,500 n/a