Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
SIC 2044 Rice Milling
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS2205 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,916 $3,142 Implemented
LS2205 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,208 $100 Implemented
LS2205 # 02 Y:2022 02 2022 INSTALL TIMERS AND/OR THERMOSTATS $483 $50 Implemented
LS2205 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $778 $135 Implemented
LL0298 # 03 Y:2008 03 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,972 $240 Implemented
LL0298 # 02 Y:2008 02 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $3,587 $152 Implemented
LL0295 # 08 Y:2008 08 2008 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $265 $152 Implemented
LL0295 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,016 $760 Implemented
LL0247 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $570 $151 Implemented
LL0247 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $210 $120 Implemented
LL0247 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $333 $60 Implemented
LL0248 # 06 Y:2006 06 2006 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $900 $300 Implemented
LL0248 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,082 $20 Implemented
LL0248 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $151 Implemented
LL0248 # 03 Y:2006 03 2006 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,218 $80 Implemented
LL0248 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,463 $1,022 Implemented
LL0234 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $69,333 $500 Implemented
LL0234 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,415 $1,250 Implemented
LL0234 # 05 Y:2005 05 2005 USE PHOTOCELL CONTROLS $501 $100 Implemented
LL0234 # 08 Y:2005 08 2005 $24,050 $7,000 Implemented
LL0234 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $136 $200 Implemented
LL0234 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $393 $300 Implemented
LL0233 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,619 $14,000 Implemented
LL0233 # 04 Y:2005 04 2005 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $17,072 $2,900 Implemented
LL0233 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,837 $3,400 Implemented