41

matching recommendations
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID Products Savings Cost
OR0680 # 04 Y:2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,732 $3,529
OR0680 # 03 Y:2017 ADJUST BURNERS FOR EFFICIENT OPERATION $2,467 $1,000
OR0680 # 01 Y:2017 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,000 $66,392
BS0044 # 08 Y:2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $10,868
BS0044 # 09 Y:2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,126 $1,190
BS0044 # 06 Y:2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,633 $872
BS0044 # 04 Y:2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,828 $9,000
BS0044 # 05 Y:2014 INCREASE INSULATION THICKNESS $9,004 $6,600
BS0044 # 03 Y:2014 INSULATE BARE EQUIPMENT $338 $893
BS0044 # 02 Y:2014 ELIMINATE LEAKS IN WATER LINES AND VALVES $2,822 $2,600
BS0043 # 03 Y:2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $111,915 $69,000
BS0043 # 04 Y:2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,411 $5,075
BS0043 # 06 Y:2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,075 $429
BS0043 # 01 Y:2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $63,855 $15,000
ORS005 # 10 Y:1999 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $0 $490