IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

30

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0218 # 02 Y:2019 02 2019 INSTALL OCCUPANCY SENSORS $1,874 $198 Implemented
UA0218 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,378 $6,360 Implemented
UA0217 # 06 Y:2019 06 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,941 $50 Implemented
UA0217 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,910 $1,395 Implemented
UA0215 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $678 $970 Implemented
UA0215 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $816 $50 Implemented
UA0215 # 01 Y:2019 01 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,317 $50 Implemented
UA0211 # 07 Y:2019 07 2019 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $374,108 $1,310,277 Implemented
UA0211 # 08 Y:2019 08 2019 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $26,196 $150 Implemented
UA0210 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,087 $1,345 Implemented
UA0210 # 02 Y:2019 02 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,939 $100 Implemented
UA0210 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,983 $12,313 Implemented
UA0209 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $72,891 $2,850 Implemented
UA0209 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,815 $10,528 Implemented
UA0209 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,697 $3,007 Implemented
UA0207 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,657 $5,249 Implemented
UA0206 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $7,065 $8,101 Implemented
UA0206 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $1,372 Implemented
UA0205 # 04 Y:2019 04 2019 MODIFY STARTUP/SHUTDOWN TIMES $280 $0 Implemented
UA0205 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,908 Implemented
UA0204 # 05 Y:2019 05 2019 INSULATE BARE EQUIPMENT $439 $1,082 Implemented
UA0204 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,537 $1,285 Implemented
UA0204 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,219 $250 Implemented
UA0204 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $66,234 $104,269 Implemented
UA0203 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $3,682 $2,568 Implemented