IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,213

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0054 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15 $147 Implemented
AS0054 # 06 Y:1992 06 1992 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $3,062 $2,400 Not Implemented
AS0054 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,880 $100 Implemented
AS0053 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,641 $31,121 Not Implemented
AS0053 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,207 $0 Not Implemented
AS0053 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,961 $7,628 Not Implemented
AS0053 # 04 Y:1992 04 1992 INSULATE BARE EQUIPMENT $12,327 $5,772 Implemented
AS0053 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON STEAM LINES $2,693 $989 Implemented
AS0053 # 06 Y:1992 06 1992 REPAIR AND ELIMINATE STEAM LEAKS $61,904 $27,000 Implemented
AS0053 # 07 Y:1992 07 1992 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $68,532 $7,500 Not Implemented
AS0053 # 08 Y:1992 08 1992 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $-39,218 $800,000 Not Implemented
AS0053 # 09 Y:1992 09 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $202 $420 Not Implemented
AS0053 # 10 Y:1992 10 1992 USE HEAT PUMP FOR SPACE CONDITIONING $3,520 $12,000 Not Implemented
AS0053 # 11 Y:1992 11 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $877 $7,308 Not Implemented
AS0053 # 12 Y:1992 12 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,687 $3,584 Not Implemented
AS0053 # 13 Y:1992 13 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,333 $400 Implemented
AS0053 # 14 Y:1992 14 1992 IMPROVE LUBRICATION PRACTICES $1,257 $1,092 Not Implemented
AS0052 # 01 Y:1992 01 1992 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $27,304 $96,000 Implemented
AS0052 # 02 Y:1992 02 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,779 $9,821 Implemented
AS0052 # 03 Y:1992 03 1992 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $733 $1,500 Not Implemented
AS0052 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42 $332 Implemented
AS0052 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,444 $6,291 Implemented
AS0052 # 06 Y:1992 06 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,983 $1,280 Implemented
AS0052 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $645 $1,512 Implemented
AS0052 # 08 Y:1992 08 1992 INSTALL SET-BACK TIMERS $3,474 $200 Not Implemented