IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

89

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0240 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,175 $8,691 Implemented
AS0240 # 05 Y:1998 05 1998 MINIMIZE WATER USAGE $4,646 $30 Implemented
AS0240 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,086 $3,800 Implemented
AS0240 # 06 Y:1998 06 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,896 $60 Implemented
AS0229 # 09 Y:1998 09 1998 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,718 $450 Implemented
AS0229 # 10 Y:1998 10 1998 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $859 $150 Implemented
AS0229 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $435 Implemented
AS0229 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $16,030 $56,554 Implemented
AS0229 # 02 Y:1998 02 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,979 $200 Implemented
AS0234 # 04 Y:1998 04 1998 $132,000 $48,000 Implemented
AS0234 # 03 Y:1998 03 1998 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,384 $60 Implemented
AS0234 # 07 Y:1998 07 1998 $84 $360 Implemented
AS0228 # 01 Y:1998 01 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $244,239 $410,200 Implemented
AS0228 # 10 Y:1998 10 1998 $6,873 $3,125 Implemented
AS0228 # 09 Y:1998 09 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $498,755 $240 Implemented
AS0233 # 07 Y:1998 07 1998 $47,175 $480 Implemented
AS0233 # 09 Y:1998 09 1998 $11,008 $1,480 Implemented
AS0233 # 10 Y:1998 10 1998 $96,975 $150,000 Implemented
AS0232 # 04 Y:1998 04 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,577 $785 Implemented
AS0232 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,829 $20,012 Implemented
AS0231 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,912 $23,975 Implemented
AS0231 # 04 Y:1998 04 1998 INSTALL TIMERS AND/OR THERMOSTATS $613 $1,425 Implemented
AS0231 # 09 Y:1998 09 1998 $12,854 $450 Implemented
AS0231 # 07 Y:1998 07 1998 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $616 $60 Implemented
AS0227 # 06 Y:1998 06 1998 ELIMINATE PRACTICE OF MIXING WASTE STREAMS $700 $30 Implemented