IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0333 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $597 $20 Implemented
AS0333 # 06 Y:2002 06 2002 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $1,272 $60 Implemented
AS0332 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $909 $4,165 Implemented
AS0331 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,966 $20 Implemented
AS0331 # 09 Y:2002 09 2002 $819 $144 Implemented
AS0331 # 08 Y:2002 08 2002 $89,018 $19,710 Implemented
AS0331 # 06 Y:2002 06 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $371 $63 Implemented
AS0331 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $542 Implemented
AS0329 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $591 $737 Implemented
AS0328 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,170 $4,422 Implemented
AS0328 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $540 $675 Implemented
AS0328 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,442 $737 Implemented
AS0328 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $10,487 $2,091 Implemented
AS0328 # 06 Y:2002 06 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,223 $9,800 Implemented
AS0327 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,614 $200 Implemented
AS0327 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,352 $3,671 Implemented
AS0327 # 05 Y:2002 05 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $863 $2,450 Implemented
AS0327 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $9,397 $2,000 Implemented
AS0327 # 10 Y:2002 10 2002 $1,804 $108 Implemented
AS0321 # 05 Y:2002 05 2002 $4,394 $323 Implemented
AS0321 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $16,063 $4,370 Implemented
AS0321 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,666 $100 Implemented
AS0321 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,990 $2,700 Implemented
AS0316 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,660 $14,391 Implemented
AS0316 # 06 Y:2002 06 2002 $294,108 $3,024 Implemented