IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0430 # 04 Y:2006 04 2006 INSTALL SKYLIGHTS $782 $4,400 Implemented
AS0430 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3 $1,077 Implemented
AS0430 # 02 Y:2006 02 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,545 $7,500 Implemented
AS0426 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,539 $15,085 Implemented
AS0426 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,221 $1,000 Implemented
AS0426 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $8,267 $2,077 Implemented
AS0426 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,823 $500 Implemented
AS0425 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $382 $99 Implemented
AS0425 # 02 Y:2006 02 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,372 $15,000 Implemented
AS0425 # 01 Y:2006 01 2006 REPAIR AND ELIMINATE STEAM LEAKS $11,573 $500 Implemented
AS0420 # 06 Y:2006 06 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $885 $13,820 Implemented
AS0420 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,338 $5,000 Implemented
AS0420 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,359 $18,572 Implemented
AS0416 # 03 Y:2006 03 2006 $3,096 $0 Implemented
AS0416 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,872 $34,827 Implemented
AS0415 # 03 Y:2006 03 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,372 $1,000 Implemented
AS0415 # 01 Y:2006 01 2006 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $19,739 $5,500 Implemented
AS0414 # 03 Y:2006 03 2006 $17,731 $200 Implemented
AS0414 # 02 Y:2006 02 2006 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $28,518 $20,000 Implemented
AS0413 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,882 $1,000 Implemented
AS0413 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,455 $15,000 Implemented
AS0413 # 02 Y:2006 02 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $18,423 $15,000 Implemented