IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,843

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0022 # 10 Y:1985 10 1985 SHUT OFF PILOTS IN STANDBY EQUIPMENT $77 $0 Implemented
CO0023 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,206 $2,724 Not Implemented
CO0023 # 02 Y:1985 02 1985 INSULATE BARE EQUIPMENT $1,114 $380 Not Implemented
CO0023 # 03 Y:1985 03 1985 RECOVER WASTE HEAT FROM EQUIPMENT $6,891 $5,000 Implemented
CO0023 # 04 Y:1985 04 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,690 $375 Implemented
CO0023 # 05 Y:1985 05 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $159 $20 Not Implemented
CO0023 # 06 Y:1985 06 1985 INSTALL TIMERS AND/OR THERMOSTATS $1,957 $10,000 Not Implemented
CO0023 # 07 Y:1985 07 1985 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,364 $100 Implemented
CO0018 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,938 $798 Implemented
CO0018 # 02 Y:1985 02 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $511 $300 Implemented
CO0018 # 03 Y:1985 03 1985 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $17,952 $100 Implemented
CO0018 # 04 Y:1985 04 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $54 $92 Implemented
CO0018 # 05 Y:1985 05 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $304 $51 Implemented
CO0018 # 06 Y:1985 06 1985 USE OPTIMUM THICKNESS INSULATION $550 $210 Implemented
CO0018 # 07 Y:1985 07 1985 INSTALL TIMERS AND/OR THERMOSTATS $8,891 $2,400 Implemented
CO0018 # 08 Y:1985 08 1985 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS $246 $50 Implemented
CO0018 # 09 Y:1985 09 1985 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $863 $500 Not Implemented
CO0019 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $568 $353 Implemented
CO0019 # 02 Y:1985 02 1985 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,533 $3,200 Implemented
CO0019 # 03 Y:1985 03 1985 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,278 $2,000 Not Implemented
CO0019 # 04 Y:1985 04 1985 INSTALL TIMERS AND/OR THERMOSTATS $4,121 $218 Not Implemented
CO0019 # 05 Y:1985 05 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,572 $4,000 Not Implemented
CO0019 # 06 Y:1985 06 1985 RECOVER WASTE HEAT FROM EQUIPMENT $657 $1,200 Not Implemented
CO0019 # 07 Y:1985 07 1985 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $568 $30 Not Implemented
CO0020 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,993 $2,632 Implemented