IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,039

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0232 # 18 Y:2024 18 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,092 $10,000 n/a
DL0232 # 06 Y:2024 06 2024 INSTALL TIMERS AND/OR THERMOSTATS $7,288 $84 n/a
DL0232 # 07 Y:2024 07 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,850 $1,637 n/a
DL0232 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,930 $7,995 n/a
DL0232 # 12 Y:2024 12 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,886 $5,000 n/a
DL0232 # 17 Y:2024 17 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,477 $2,488 n/a
DL0232 # 10 Y:2024 10 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $546 $0 n/a
DL0232 # 14 Y:2024 14 2024 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $9,758 $1,500 n/a
DL0232 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $1,952 $0 n/a
DL0232 # 03 Y:2024 03 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $848 $0 n/a
DL0232 # 08 Y:2024 08 2024 RECOVER WASTE HEAT FROM EQUIPMENT $2,946 $10,000 n/a
DL0229 # 05 Y:2023 05 2023 USE HEAT PUMP FOR SPACE CONDITIONING $2,948 $14,000 n/a
DL0229 # 02 Y:2023 02 2023 REDUCE VENTILATION AIR $32,353 $0 n/a
DL0229 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $104,868 $500,000 n/a
DL0229 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $61,397 $0 n/a
DL0229 # 04 Y:2023 04 2023 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $44,923 $1,275 n/a
DL0229 # 03 Y:2023 03 2023 USE OPTIMUM TEMPERATURE $8,303 $0 n/a
DL0226 # 06 Y:2023 06 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,451 $0 n/a
DL0226 # 10 Y:2023 10 2023 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $56,102 $91,218 n/a
DL0226 # 01 Y:2023 01 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,718 $0 n/a
DL0226 # 03 Y:2023 03 2023 ADJUST VENTS TO MINIMIZE ENERGY USE $2,053 $0 n/a
DL0226 # 07 Y:2023 07 2023 REDUCE VENTILATION AIR $1,643 $57 n/a
DL0226 # 04 Y:2023 04 2023 REDUCE VENTILATION AIR $2,739 $0 n/a
DL0226 # 05 Y:2023 05 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $4,421 $3,000 n/a
DL0226 # 09 Y:2023 09 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,355 $9,585 n/a