IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,578

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0586 # 04 Y:2022 04 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,260 $25,400 Implemented
UF0586 # 05 Y:2022 05 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,306 $9,876 Implemented
UF0586 # 06 Y:2022 06 2022 IMPROVE SPACE COMFORT CONDITIONING $24,960 $4,480 Implemented
MI0413 # 09 Y:2022 09 2022 INSTALL OCCUPANCY SENSORS $355 $140 Implemented
MI0413 # 08 Y:2022 08 2022 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $755 $645 Implemented
MI0413 # 06 Y:2022 06 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,004 $1,980 Implemented
MI0413 # 05 Y:2022 05 2022 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,089 $5,264 Implemented
MI0413 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $580 Implemented
MI0413 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,013 $5,249 Implemented
MI0413 # 02 Y:2022 02 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $4,023 $0 Implemented
MI0411 # 07 Y:2022 07 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,063 $27,147 Implemented
MI0411 # 06 Y:2022 06 2022 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,028 $0 Implemented
MI0411 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,210 $1,650 Implemented
MI0411 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $15,400 $630 Implemented
UF0585 # 01 Y:2022 01 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,858 $44,939 Implemented
UF0585 # 02 Y:2022 02 2022 INCREASE AMOUNT OF CONDENSATE RETURNED $11,758 $1,342 Implemented
UF0585 # 03 Y:2022 03 2022 INSTALL TURBULATORS $6,811 $7,500 Implemented
UF0585 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,918 $756 Implemented
UF0585 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,345 $0 Implemented
UF0585 # 06 Y:2022 06 2022 LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS $45,977 $0 Implemented
UF0585 # 07 Y:2022 07 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $19,210 $10,000 Implemented
UF0584 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,855 $40,432 Implemented
UF0584 # 10 Y:2022 10 2022 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT $68,493 $0 Implemented
UF0583 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,276 $1,243,750 Implemented
UF0583 # 02 Y:2022 02 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $44,987 $62,001 Implemented