IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

359

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0050 # 04 Y:2002 04 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $10,046 $21,150 Not Implemented
MI0050 # 06 Y:2002 06 2002 UPGRADE CONTROLS ON COMPRESSORS $2,860 $1,338 Not Implemented
MI0050 # 05 Y:2002 05 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,880 $2 Not Implemented
MI0050 # 02 Y:2002 02 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $95,397 $66,000 Not Implemented
MI0050 # 01 Y:2002 01 2002 $173,081 $82,800 Not Implemented
MI0050 # 03 Y:2002 03 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $53,360 $5,000 Not Implemented
UF0312 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $10,427 $20,000 Implemented
UF0312 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,934 $500 Not Implemented
UF0312 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $1,258 $6,000 Not Implemented
UF0312 # 01 Y:2002 01 2002 $6,162 $7,981 Implemented
UF0312 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $38,400 $31,277 Not Implemented
UF0312 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,131 $1,074 Implemented
UF0311 # 05 Y:2002 05 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $31,940 $189,000 Not Implemented
UF0311 # 02 Y:2002 02 2002 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $20,300 $1,640 Implemented
UF0311 # 06 Y:2002 06 2002 RECYCLE FLUORESCENT LAMPS $10,412 $1,895 Not Implemented
UF0311 # 03 Y:2002 03 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,246 $0 Not Implemented
UF0311 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,935 $119,640 Not Implemented
UF0311 # 04 Y:2002 04 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $15,812 $20,000 Implemented
UF0306 # 06 Y:2002 06 2002 $48,671 $1,074 Not Implemented
UF0306 # 05 Y:2002 05 2002 RECOVER AND REUSE WASTE MATERIAL $10,048 $0 Not Implemented
UF0306 # 04 Y:2002 04 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $592,558 $1,120,000 Not Implemented
UF0306 # 03 Y:2002 03 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,327 $0 Implemented
UF0306 # 07 Y:2002 07 2002 $208,938 $33,980 Not Implemented
UF0306 # 08 Y:2002 08 2002 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $107,170 $114,485 Not Implemented
UF0306 # 02 Y:2002 02 2002 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,764 $7,800 Not Implemented