IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

97

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0605 # 01 Y:1996 01 1996 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,246 $675 Implemented
GT0605 # 06 Y:1996 06 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,120 $4,300 Implemented
GT0605 # 05 Y:1996 05 1996 METER WASTE WATER $14,720 $0 Implemented
GT0605 # 04 Y:1996 04 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,090 $1,450 Implemented
GT0605 # 07 Y:1996 07 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,000 $4,908 Implemented
GT0605 # 02 Y:1996 02 1996 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,110 $3,500 Implemented
GT0605 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN WATER LINES AND VALVES $3,308 $103 Implemented
GT0605 # 09 Y:1996 09 1996 SELL / OFFER BY-PRODUCT AS ANIMAL FEED $260,000 $49,800 Implemented
GT0603 # 05 Y:1996 05 1996 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $2,200 $3,500 Implemented
GT0603 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,880 $0 Implemented
GT0603 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,300 $1,200 Implemented
GT0603 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,071 $3,036 Implemented
GT0604 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,940 $0 Implemented
GT0603 # 04 Y:1996 04 1996 USE PHOTOCELL CONTROLS $490 $160 Implemented
GT0604 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,504 $11,400 Implemented
UF0165 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,841 $1,350 Implemented
UF0165 # 04 Y:1996 04 1996 CLEAN CONDENSER TUBES $19,869 $0 Implemented
GT0601 # 01 Y:1996 01 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,440 $12,710 Implemented
GT0601 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,643 $350 Implemented
GT0601 # 06 Y:1996 06 1996 USE LESS WASTEFUL PACKAGING $21,600 $45,000 Implemented
GT0601 # 05 Y:1996 05 1996 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,830 $6,000 Implemented
GT0600 # 01 Y:1996 01 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,940 $0 Implemented
GT0600 # 03 Y:1996 03 1996 REDUCE VENTILATION AIR $1,560 $3,000 Implemented
GT0600 # 04 Y:1996 04 1996 TREAT AND REUSE RINSE WATERS $9,140 $12,000 Implemented
GT0599 # 01 Y:1996 01 1996 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $5,660 $18,860 Implemented