IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0919 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,773 $8,000 Implemented
GT0919 # 06 Y:2018 06 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $90,950 $1,944,000 Implemented
GT0919 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,045 $18,576 Implemented
GT0918 # 06 Y:2018 06 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $232 $1,000 Implemented
GT0918 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,373 $5,449 Implemented
GT0918 # 02 Y:2018 02 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,414 $3,500 Implemented
GT0918 # 01 Y:2018 01 2018 PAY BILLS ON TIME TO AVOID LATE FEES $3,016 $1,488 Implemented
GT0917 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,834 $10,400 Implemented
GT0916 # 08 Y:2018 08 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,406 $38,834 Implemented
GT0916 # 07 Y:2018 07 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,215 $10,400 Implemented
GT0916 # 01 Y:2018 01 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,228 $263 Implemented
GT0916 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $55,747 $3,800 Implemented
GT0914 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,676 $26,357 Implemented
GT0914 # 02 Y:2018 02 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $18,164 $400 Implemented
GT0912 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,774 $17,795 Implemented
GT0912 # 03 Y:2018 03 2018 INSULATE BARE EQUIPMENT $39,033 $804 Implemented
GT0912 # 02 Y:2018 02 2018 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $8,530 $142 Implemented
GT0912 # 01 Y:2018 01 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,273 $150 Implemented
UA0189 # 05 Y:2018 05 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,704 $100 Implemented
UA0189 # 03 Y:2018 03 2018 USE MINIMUM STEAM OPERATING PRESSURE $3,482 $50 Implemented
UA0189 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,745 $5,828 Implemented
UA0189 # 06 Y:2018 06 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,357 $3,000 Implemented
GT0911 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,788 $5,633 Implemented
GT0911 # 03 Y:2018 03 2018 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $310 $180 Implemented
GT0911 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,999 $3,000 Implemented