IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

55

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0010 # 05 Y:2012 05 2012 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $70 $60 Not Implemented
BS0010 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $645 $251 Implemented
BS0010 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,826 $750 Not Implemented
BS0010 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $222 $512 Implemented
BS0010 # 01 Y:2012 01 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $289 $630 Not Implemented
BS0008 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,298 $14,400 Not Implemented
BS0008 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $475 $15 Not Implemented
BS0008 # 04 Y:2012 04 2012 USE PHOTOCELL CONTROLS $427 $227 Not Implemented
BS0008 # 01 Y:2012 01 2012 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $9,360 $350 Not Implemented
BS0008 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,079 $117 Not Implemented
BS0005 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,653 $7,846 Not Implemented
BS0005 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,615 $10,000 Implemented
BS0005 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $11,990 $17,000 Not Implemented
BS0005 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,970 $609 Implemented
BS0005 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $2,733 $178 Implemented
BS0005 # 01 Y:2012 01 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $265 $555 Not Implemented
BS0007 # 01 Y:2012 01 2012 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $1,790 $4,911 Not Implemented
BS0007 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,760 $649 Implemented
BS0007 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $98 $0 Not Implemented
BS0007 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $186 $300 Not Implemented
BS0007 # 05 Y:2012 05 2012 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,845 $6,260 Not Implemented
BS0007 # 06 Y:2012 06 2012 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,204 $7,725 Not Implemented
BS0006 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $4,588 $11,386 Not Implemented
BS0006 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $154 $290 Not Implemented
BS0006 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $698 $90 Implemented