IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,527

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0201 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,589 $2,500 n/a
WM0201 # 03 Y:2023 03 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,633 $7,520 n/a
WM0201 # 04 Y:2023 04 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,077 $1,814 n/a
WM0201 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $1,042 $195 n/a
MZ0346 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $425 $485 Not Implemented
MZ0346 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $146 $200 Implemented
MZ0346 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,048 $6,536 Not Implemented
MZ0346 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $967 $320 Not Implemented
MZ0346 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $825 $2,925 Implemented
IC0274 # 01 Y:2023 01 2023 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $233 $359 Implemented
IC0274 # 02 Y:2023 02 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $73 $316 Not Implemented
IC0274 # 03 Y:2023 03 2023 USE POWER DURING OFF-PEAK PERIODS $24,024 $0 Implemented
IC0274 # 04 Y:2023 04 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $49,006 $1,358,975 Not Implemented
IC0273 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,366 $2,851 Not Implemented
IC0273 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,794 $4,100 Not Implemented
IC0273 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $879 $841 Not Implemented
IC0273 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $200 $35 Not Implemented
IC0273 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $279,174 $2,543,426 Not Implemented
IC0272 # 01 Y:2023 01 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,198 $10,487 Not Implemented
IC0272 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,712 $3,525 Implemented
IC0272 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $562 $1,098 Implemented
IC0272 # 04 Y:2023 04 2023 AIR CONDITION ONLY SPACE NECESSARY $647 $0 Implemented
IC0272 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $341 $35 Implemented
IC0271 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,828 $2,808 Implemented
IC0271 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,279 $6,000 Not Implemented