Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
26
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0040 # 10 Y:1988 | 10 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,749 | $250 | Implemented |
WI0040 # 08 Y:1988 | 08 | 1988 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $14,600 | $0 | Implemented |
WI0040 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $5,607 | $0 | Implemented |
WI0038 # 03 Y:1988 | 03 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $953 | $1,000 | Implemented |
WI0037 # 07 Y:1988 | 07 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,695 | $1,500 | Implemented |
WI0037 # 06 Y:1988 | 06 | 1988 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,189 | $0 | Implemented |
WI0037 # 05 Y:1988 | 05 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,732 | $0 | Implemented |
WI0037 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $885 | $1,000 | Implemented |
WI0037 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $43,747 | $33,748 | Implemented |
WI0037 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,535 | $0 | Implemented |
WI0034 # 02 Y:1988 | 02 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,718 | $0 | Implemented |
WI0034 # 04 Y:1988 | 04 | 1988 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $434 | $0 | Implemented |
WI0034 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,480 | $6,401 | Implemented |
WI0034 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $9,202 | $0 | Implemented |
WI0024 # 06 Y:1988 | 06 | 1988 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $544 | $700 | Implemented |
WI0024 # 03 Y:1988 | 03 | 1988 | INSTALL SET-BACK TIMERS | $344 | $0 | Implemented |
WI0024 # 02 Y:1988 | 02 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $541 | $1,000 | Implemented |
WI0022 # 01 Y:1988 | 01 | 1988 | IMPROVE LUBRICATION PRACTICES | $9,403 | $0 | Implemented |
WI0023 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $104 | $0 | Implemented |
WI0023 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $716 | $500 | Implemented |
WI0023 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $259 | $163 | Implemented |
WI0023 # 02 Y:1988 | 02 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $327 | $500 | Implemented |
WI0022 # 05 Y:1988 | 05 | 1988 | AIR CONDITION ONLY SPACE NECESSARY | $1,625 | $2,500 | Implemented |
WI0022 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $220 | $500 | Implemented |
WI0022 # 03 Y:1988 | 03 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,405 | $196 | Implemented |