IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

59

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0724 # 03 Y:2005 03 2005 USE PHOTOCELL CONTROLS $16,400 $0 Implemented
UD0724 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $880 Implemented
UD0724 # 09 Y:2005 09 2005 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $3,364 $0 Implemented
UD0724 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $13,563 $6,505 Implemented
UD0723 # 05 Y:2005 05 2005 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $6,126 $7,000 Implemented
UD0723 # 15 Y:2005 15 2005 UPGRADE CONTROLS ON COMPRESSORS $522 $0 Implemented
UD0723 # 12 Y:2005 12 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,164 $0 Implemented
UD0723 # 11 Y:2005 11 2005 INSULATE BARE EQUIPMENT $2,650 $2,629 Implemented
UD0723 # 08 Y:2005 08 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,309 $0 Implemented
UD0723 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,315 $13,340 Implemented
UD0723 # 02 Y:2005 02 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,430 $0 Implemented
UD0723 # 07 Y:2005 07 2005 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,573 $0 Implemented
UD0723 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,840 $65,105 Implemented
IC0106 # 08 Y:2005 08 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $38,651 $1,902 Implemented
IC0106 # 09 Y:2005 09 2005 OPTIMIZE PLANT POWER FACTOR $69,451 $120,000 Implemented
IC0106 # 11 Y:2005 11 2005 INSTALL TIMERS AND/OR THERMOSTATS $16,926 $20,423 Implemented
IC0106 # 13 Y:2005 13 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,662 $900 Implemented
IC0106 # 14 Y:2005 14 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,959 $73,466 Implemented
IC0106 # 12 Y:2005 12 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,545 $890 Implemented
IC0106 # 01 Y:2005 01 2005 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $19,946 $16,320 Implemented
IC0106 # 02 Y:2005 02 2005 REPAIR AND ELIMINATE STEAM LEAKS $32,401 $6,800 Implemented
IC0106 # 03 Y:2005 03 2005 REPAIR OR REPLACE STEAM TRAPS $10,215 $314 Implemented
IC0106 # 04 Y:2005 04 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $6,280 $46,950 Implemented
IC0106 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON STEAM LINES $513 $107 Implemented
IC0106 # 07 Y:2005 07 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $0 Implemented