IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0110 # 05 Y:1983 05 1983 SHUT OFF PILOTS IN STANDBY EQUIPMENT $200 $0 Not Implemented
KU0110 # 08 Y:1983 08 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $162 $0 Not Implemented
KU0111 # 06 Y:1983 06 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $214 $0 Not Implemented
KU0110 # 06 Y:1983 06 1983 INSTALL TIMERS AND/OR THERMOSTATS $445 $200 Not Implemented
KU0110 # 07 Y:1983 07 1983 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $162 $0 Not Implemented
KU0111 # 03 Y:1983 03 1983 INSTALL AUTOMATIC STACK DAMPER $246 $400 Not Implemented
KU0110 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,125 $300 Not Implemented
KU0111 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $358 $600 Not Implemented
KU0110 # 04 Y:1983 04 1983 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $465 $3,000 Implemented
KU0111 # 02 Y:1983 02 1983 INSULATE BARE EQUIPMENT $272 $391 Not Implemented
KU0110 # 03 Y:1983 03 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,606 $4,200 Implemented
KU0111 # 04 Y:1983 04 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $214 $200 Implemented
KU0110 # 02 Y:1983 02 1983 INSTALL AUTOMATIC STACK DAMPER $1,012 $800 Implemented
KU0111 # 05 Y:1983 05 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $564 $438 Not Implemented
KU0108 # 09 Y:1983 09 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $329 $0 Not Implemented
KU0108 # 08 Y:1983 08 1983 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $191 $0 Not Implemented
KU0108 # 07 Y:1983 07 1983 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $1,840 $52 Implemented
KU0108 # 06 Y:1983 06 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,351 $6,314 Implemented
KU0109 # 03 Y:1983 03 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $271 $0 Not Implemented
KU0108 # 01 Y:1983 01 1983 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $760 $400 Implemented
KU0108 # 05 Y:1983 05 1983 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $872 $132 Implemented
KU0107 # 11 Y:1983 11 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $41 $0 Implemented
KU0108 # 02 Y:1983 02 1983 OPTIMIZE PLANT POWER FACTOR $6,604 $16,000 Implemented
KU0109 # 01 Y:1983 01 1983 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,001 $1,384 Not Implemented
KU0109 # 04 Y:1983 04 1983 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $106 $0 Not Implemented