Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
257
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0148 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,910 | $36 | Implemented |
KU0148 # 04 Y:1984 | 04 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $436 | $700 | Implemented |
KU0149 # 21 Y:1984 | 21 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $278 | $0 | Implemented |
KU0149 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $400 | Implemented |
KU0149 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $3,920 | $350 | Implemented |
KU0149 # 25 Y:1984 | 25 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,579 | $500 | Implemented |
KU0149 # 23 Y:1984 | 23 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $4,551 | $1,425 | Implemented |
KU0148 # 12 Y:1984 | 12 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,177 | $17 | Implemented |
KU0148 # 09 Y:1984 | 09 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $298 | $12 | Implemented |
KU0149 # 12 Y:1984 | 12 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $125 | $20 | Implemented |
KU0148 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $514 | $800 | Implemented |
KU0148 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,754 | $3,000 | Implemented |
KU0148 # 05 Y:1984 | 05 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $366 | $100 | Implemented |
KU0149 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $34,443 | $3,262 | Implemented |
KU0149 # 13 Y:1984 | 13 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $911 | $820 | Implemented |
KU0149 # 10 Y:1984 | 10 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $586 | $300 | Implemented |
KU0149 # 09 Y:1984 | 09 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,551 | $300 | Implemented |
KU0149 # 16 Y:1984 | 16 | 1984 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,367 | $30 | Implemented |
KU0148 # 13 Y:1984 | 13 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,182 | $2,000 | Implemented |
KU0148 # 10 Y:1984 | 10 | 1984 | REDUCE VENTILATION AIR | $2,954 | $500 | Implemented |
KU0148 # 14 Y:1984 | 14 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $760 | $0 | Implemented |
KU0149 # 24 Y:1984 | 24 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $486 | $0 | Implemented |
KU0149 # 20 Y:1984 | 20 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $550 | Implemented |
KU0149 # 26 Y:1984 | 26 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $276 | $300 | Implemented |
KU0145 # 16 Y:1984 | 16 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $299 | $0 | Implemented |