IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

45

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0484 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,370 $24,290 Implemented
KU0484 # 02 Y:1997 02 1997 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,770 $14,200 Implemented
KU0484 # 09 Y:1997 09 1997 $18,220 $4,200 Implemented
KU0484 # 07 Y:1997 07 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $7,660 $0 Implemented
KU0481 # 02 Y:1997 02 1997 INSULATE BARE EQUIPMENT $24,670 $27,000 Implemented
KU0481 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $2,780 $1,500 Implemented
KU0481 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,190 $25,840 Implemented
KU0481 # 07 Y:1997 07 1997 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $5,460 $16,500 Implemented
KU0477 # 07 Y:1997 07 1997 USE SYNTHETIC LUBRICANT $340 $1,100 Implemented
KU0477 # 01 Y:1997 01 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,340 $18,090 Implemented
KU0477 # 05 Y:1997 05 1997 RECOVER WASTE HEAT FROM EQUIPMENT $580 $140 Implemented
KU0477 # 02 Y:1997 02 1997 INSTALL OCCUPANCY SENSORS $2,980 $1,600 Implemented
KU0477 # 03 Y:1997 03 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $640 $1,000 Implemented
KU0477 # 04 Y:1997 04 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $590 $1,450 Implemented
KU0477 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $350 $130 Implemented
OK0528 # 01 Y:1997 01 1997 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $17,998 $48,754 Implemented
OK0528 # 05 Y:1997 05 1997 USE OPTIMUM THICKNESS INSULATION $747 $166 Implemented
OK0528 # 04 Y:1997 04 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $962 $114 Implemented
OK0528 # 02 Y:1997 02 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,011 $3,500 Implemented
KU0476 # 01 Y:1997 01 1997 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,340 $0 Implemented
KU0476 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,360 $5,470 Implemented
KU0476 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,010 $230 Implemented
KU0476 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $180 $270 Implemented
KU0476 # 10 Y:1997 10 1997 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $3,340 $300 Implemented
KU0476 # 11 Y:1997 11 1997 $7,620 $0 Implemented