Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0691 # 07 Y:2004 07 2004 UTILIZE A LESS EXPENSIVE COOLING METHOD $886 $139 Implemented
OK0691 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $254 $760 Not Implemented
OK0691 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $265 $0 Implemented
OK0691 # 04 Y:2004 04 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,036 $559 Implemented
OK0691 # 03 Y:2004 03 2004 INSTALL SET-BACK TIMERS $6,531 $3,832 Implemented
OK0691 # 02 Y:2004 02 2004 $270,439 $2,825 Implemented
OK0691 # 01 Y:2004 01 2004 $90,154 $5,782 Not Implemented
IC0078 # 11 Y:2004 11 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $819 $920 n/a
IC0078 # 14 Y:2004 14 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $3,949 $750 n/a
IC0078 # 13 Y:2004 13 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $260 $0 n/a
IC0078 # 12 Y:2004 12 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,626 $955 n/a
IC0078 # 01 Y:2004 01 2004 INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK $41,155 $96,800 n/a
IC0078 # 10 Y:2004 10 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $689 $1,252 n/a
IC0078 # 09 Y:2004 09 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,026 $142,221 n/a
IC0078 # 08 Y:2004 08 2004 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $222 $75 n/a
IC0078 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,790 $1,700 n/a
IC0078 # 06 Y:2004 06 2004 KEEP SOLID FUELS / RAW MATERIALS DRY $1,999 $11,950 n/a
IC0078 # 05 Y:2004 05 2004 REPAIR AND ELIMINATE STEAM LEAKS $7,304 $900 n/a
IC0078 # 04 Y:2004 04 2004 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,992 $0 n/a
IC0078 # 03 Y:2004 03 2004 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $9,520 $33,750 n/a
IC0078 # 02 Y:2004 02 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,540 $2,212 n/a