IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

24

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0753 # 09 Y:2007 09 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,439 $4,489 Not Implemented
OK0753 # 08 Y:2007 08 2007 $1,000 $0 Not Implemented
OK0753 # 07 Y:2007 07 2007 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $3,437 $13,500 Not Implemented
OK0753 # 06 Y:2007 06 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,715 $4,795 Not Implemented
OK0753 # 05 Y:2007 05 2007 $387,006 $553,000 Not Implemented
OK0753 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $4,874 $9,950 Not Implemented
OK0753 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,786 $3,600 Not Implemented
OK0753 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,594 $289 Not Implemented
OK0753 # 01 Y:2007 01 2007 OPTIMIZE PLANT POWER FACTOR $49,649 $0 Implemented
OK0751 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,572 $2,401 Not Implemented
OK0751 # 03 Y:2007 03 2007 $2,188 $200 Not Implemented
OK0751 # 02 Y:2007 02 2007 $59,692 $201,700 Not Implemented
OK0748 # 07 Y:2007 07 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $8,337 $8,477 Not Implemented
OK0748 # 06 Y:2007 06 2007 INSTALL TIMERS AND/OR THERMOSTATS $34,710 $1,002 Not Implemented
OK0748 # 05 Y:2007 05 2007 REPAIR AND ELIMINATE STEAM LEAKS $22,467 $1,029 Implemented
OK0748 # 04 Y:2007 04 2007 OPERATE BOILERS ON HIGH FIRE SETTING $22,448 $2,495 Implemented
OK0748 # 03 Y:2007 03 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,835 $6,840 Implemented
OK0748 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,523 $559 Implemented
OK0748 # 01 Y:2007 01 2007 RECOVER WASTE HEAT FROM EQUIPMENT $8,664 $3,013 Implemented
OK0742 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,095 $79,680 Not Implemented
OK0742 # 05 Y:2007 05 2007 INSULATE BARE EQUIPMENT $2,516 $3,910 Implemented
OK0742 # 04 Y:2007 04 2007 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,966 $5,529 Not Implemented
OK0742 # 03 Y:2007 03 2007 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,664 $275 Implemented
OK0742 # 02 Y:2007 02 2007 RECOVER WASTE HEAT FROM EQUIPMENT $2,095 $3,851 Not Implemented